Recommended sandbox-to-production deployment flow for Game Hub launches

Last updated: June 3, 2026

Recommended sandbox-to-production deployment flow for Game Hub launches

For Game Hub launches, the recommended workflow is to configure and review content in sandbox first, then transfer it to production when you are ready to go live.

Recommended workflow

  1. Build and review in sandbox.
    Set up your content and configuration in sandbox first, including store items, bundles, daily rewards, news, update notes, translations, and design changes.
  2. Validate in sandbox.
    Use the sandbox hub to confirm that content appears as expected before launch.
  3. Transfer to production when ready.
    On launch day or whenever your team is ready, transfer the approved configuration from sandbox to production.

What can be transferred

Transfers can include items such as:

  • Design settings
  • Items and stores
  • Translations
  • Other hub configurations

Important note about transfers

Environment transfers are not limited to launch day. Content and configuration can be moved from sandbox to production or from production to sandbox at any time, depending on what you need to review or sync.

FAQ

Do we have to prepare everything in sandbox first?

It is best practice to prepare everything in sandbox first so you can review it safely before launch.

Can support sync content between environments for review?

Yes. If you need content copied between environments for validation, support can assist with transferring the relevant configuration.